WHY WE CANCEL THE Zapotillo and WORK? Because
Temacapulín 98% of a community consultation held during the 7th and January 8th, 2011, rejected the construction of the dam The Zapotillo reject the plan in Talicoyunque relocate, we confirm that we have not received specific information depth and detailed project aimed flood us and would continue to fight for our land, people, life, basilica, dead and history. Because
The right to legality and legal certainty.
A property, housing.
to environmental conservation.
The cultural heritage and national property development and
health.
Because of that analysis of human rights violations for which we are victims, it is recommended to the state governor Emilio Gonzalez Marquez halt construction of the dam The Zapotillo and alternative studies to be undertaken for dams in order to fulfill the commitment to the CNA and the Guanajuato state government, and that if required the intervention of federal authorities take the necessary steps to implement the suspension.
under Case For 2245/2008 and 2262/2008 accumulated from January 31, 2011, issued by the Court First Assistant District based in Guadalajara, Jalisco covers and protects residents and perhaps ordering Temacapulín SEMARNAT, CNA and CEA, within the scope of their powers, to suspend the construction of the dam The Zapotillo because they are violating individual guarantees:
Equality, adequate environment, and decent housing, audience, information, property, freedom of religion, national development, integral and democratic consultation and participation in planning, reasoning and motivation. Because
permission by the Constitutional Hall Cañadas de Obregón for changing land use for a curtain 105 meters, however CONAGUA ignoring the protocols continue to build the dam complete lawlessness.
Because as a community, we have documented through technical studies and international information and understand that the dams are not sustainable, projects that damage the environment, affecting thousands of people for life to move people, flooded farmland and wipe out the history, culture and identity of those who are evicted from their land by government, because they represent a model of economic development and advantageous only to foreign corporations and business associations, not to rural areas as it continues to deceive the public.
Because we are tired of local government, state and federal laws do not comply with or enforce the rule of law.
Temacapulín speaks out today and strength, along with allies who come from different corners of the country, this country so hurt by the bureaucracy and deceit with which agreements are negotiated, endorsing the call we made in November past Water Revolution in Mexico, so that all civil society join this revolution not only responds to the needs and conditions through which we pass us, but the state of emergency in the problems found in general in our country. And we call upon the legitimate right that we have not shut up and turn whatever is necessary to avoid blurring our past, present and future public policies that promote full of treachery only to a minority. We want people to remain alive!
Our definitive rejection Zapotillo Dam responds to erroneous policies which continues to manage the water in Mexico, we know that in developed countries of the Union Europe and the United States, dams are being dismantled because they have shown their serious environmental damage, while this old technology is being implemented without alternative efficient water use without the proper functioning of water treatment plants, capture and reuse water completely.
For all this we demand that the Mexican Government CANCEL FINAL SO DAM THE Zapotillo respect our position and opposition, accept no minimum democratic followed the protocols for this project, with alternatives for supplying water to the countryside and cities, without running a vast majority in their constitutional rights has been verified that the project unsustainable.
The Mexican government and authorities concerned should examine the technical and academic alternatives offered and desist from challenging the order of the federal judiciary because it would facilitate access to the administration of justice, without violating our rights. We are currently doing SEMARNAT, CNA is CEA and with premeditation and advantage to delay resolution of this matter, save time, continue with the construction of the work, affect our rights and the environment and ensure that the dam is finished to let us defenseless total, disappeared as a people.
NOT TO DAM THE Zapotillo!
GOVERNMENT NOT TO BAD!!
impositions NO!
OUR MOVEMENT IS FAIR AND LEGITIMATE!
Sincerely
The Zapotillo, Cañadas de Obregón, Jalisco, Mexico on March 28, 2011.
Save Temacapulín Acasico Committee and Palmarejo
Movement of People Affected by Dams and in Defense of Rivers (MAPDER)
Organizations Allied Social